Permits are the part of a bathroom remodel nobody puts on a mood board. They are also the part that stops a job if you pretend they are optional. This is a plain-language guide for Miami-Dade homeowners. It is not legal advice, it is not a fee schedule, and it will go stale in details. The building department that covers your address is the authority. Call them, or have your contractor confirm the current rule, before you swing a hammer.
City of Miami is not “the county” for every address
Miami-Dade is a county full of cities. The City of Miami, Coral Gables, Hialeah, Homestead, Miami Beach, and others run their own building departments. Kendall, much of Westchester, and other communities are unincorporated, which means Miami-Dade County is the building official. A friend in Coral Gables who “didn’t need a permit” may have been describing a different office, a different scope, or a memory. Do not import their story into your house.
If you are reading our city pages, this split is why they keep saying the jurisdiction follows the address. Broward and Palm Beach are different counties again. A Miami-Dade article does not permit a Boca Raton bath.
Work that usually needs a permit
As a rule of thumb, you are in permit territory when you change plumbing, electrical, or structure.
Moving a toilet, a shower drain, or a sink to a new wall changes plumbing. Replacing a shower valve often means opening the wall and tying into the supply. Replacing a water heater is its own scope and usually permitted, though many bathroom remodels do not include it. Rerouting a vent is plumbing. These are the items inspectors expect to see, because a hidden leak in a Miami house becomes a ceiling in someone else’s dining room, or in your own.
New lights, a new fan with a new circuit, an outlet for a smart toilet, or a heated floor are electrical. A like-for-like swap of a fixture on an existing box is a smaller question, and it is still worth confirming if you are also opening walls. Outlets near sinks have spacing rules. That is not paperwork for its own sake. It is how you avoid mixing water and a loose device.
Taking out a wall, widening a door in a structural wall, or changing a window opening can be structural or at least an opening the city wants drawn. Most bathroom remodels do not need to move structure. When they do, the permit is no longer a simple trade permit. Say so at the start.
Work that often does not
Painting, swapping a mirror, replacing a toilet in the same spot with a similar unit, and changing a faucet are the kinds of cosmetic or fixture-for-fixture tasks that many jurisdictions treat lightly. “Often” is doing work in that sentence. Some departments still want a permit for a toilet. Some treat a shower remodel that keeps the drain as a permitted plumbing and building job because the pan and the waterproofing matter. If your project opens the wet wall, assume you should ask, even if the drain stays.
Replacing tile on a sound wall without touching plumbing can fall in a gray area. Replacing a shower pan should not be treated as casually as paint. The pan is the part that protects the building. If you are hiring someone to rebuild it, ask them directly whether they will permit it. FL Bathroom Remodel’s license number is TBD on our site until the owner publishes it. Whoever pulls a permit has to be allowed to pull it under current state and local rules. Confirm that before the schedule is real.
Condos add a second government
The city or county is one approval. The association is another. A building can require insurance, a deposit, hours, and a review even when the city is satisfied. Some buildings prohibit relocating fixtures that share a stack. That is a private rule with very real teeth: they can stop the job. Bring the house rules to the first meeting. Do not wait until the dumpster is in the guest space.
What an inspection is looking for
Inspectors are not there to grade your grout color. On a shower remodel they are often looking at plumbing tests, electrical if it was part of the permit, and whether the wet assembly matches what was allowed. Waterproofing may be inspected before tile covers it. That sequence is why “we will tile tomorrow” is sometimes the wrong sentence. Covering work before it is seen can mean taking tile off. Build the wait into the calendar.
Fees change and are published by the department, not by this website. Budget time as well as money. A permit that takes longer than a salesperson promised is a normal Miami week, not proof that permits are fictional.
How to avoid the two expensive mistakes
The first is demo before anyone agrees a permit is or is not required. Open walls are a hard thing to pause. The second is hiring a price that only works if nobody pulls a permit, then discovering the building wants one when a neighbor complains or when you try to sell. Neither mistake is theoretical.
If you want the scope and the permit question in the same conversation, call FL Bathroom Remodel at (954) 686-3226 or email info@flbathroomremodel.com. We work in Miami-Dade, Broward, and Palm Beach, and we would rather name the office that governs your address than wave at “the county” as if it were one counter.